Our projects

Here are some of the projects that may be part of the Integrated Data Foundation's portfolio, with a brief description of each project:

-Executed more than 1490 points and 16,000 meters of fiber optic cable at King Abdulaziz Airport in Jeddah, installing fixed equipment, cable termination, testing, labeling, and commissioning

-Implemented over 1630 points and 36,000 meters of fiber optic cable at King Fahd Airport in Dammam, installing fixed equipment, cable termination, testing, labeling, and commissioning

-Wide area network implementation and operations room setup at King Fahd Airport in Dammam, with fixed hardware installation, cable termination, testing, labeling, and commissioning

-University of Arar WLAN implementation, fixed hardware installation, cable termination, testing, labeling, and commissioning via annual contracts

-Implemented a WAN for the cargo terminals at King Abdulaziz Airport in Jeddah, installing fixed equipment, terminating cables, testing, and labeling

-Implementation of 4000 points at KAU for 7 buildings, with fixed hardware installation, cable termination, testing, labeling, and commissioning

-Implementation of 2000 points in KAU for 11 buildings

-Implementation of 1300 points in the College of Computer Science at King Abdulaziz University for men and the College of Computer Science for women

-191 points in the medical city of King Abdulaziz Hospital of the National Guard

-Local Area Network (LAN) implementation for Saudi Credit Bank Installation of fixed hardware, cable termination, testing, labeling, connecting power points and phone points, and commissioning

-Implement a local area network for Dar Al-Hikma College by installing fixed hardware, terminating cables, testing, labeling, and commissioning

-Local Area Network for Emaar Properties

Scroll to Top